Commercial solar, battery storage & energy strategyTalk to our team: 0345 009 3322
Commercial Solar PV

Commercial solar designed around the site, the load and the business case.

PB Energy supports commercial solar PV from feasibility and grid connection through detailed design, installation, commissioning, monitoring and long-term maintenance.

Start with the energy profile — not a panel count

A commercially useful PV design should reflect how and when the site consumes electricity, the available roof or land, export constraints, the electrical infrastructure and the organisation’s investment priorities. We use those inputs to develop a system that is technically deliverable and commercially understandable.

Our commercial solar scope

  • Site survey and feasibility review
  • Half-hourly consumption and tariff analysis
  • Generation, self-consumption and export modelling
  • Roof, mounting, access and electrical infrastructure review
  • System layout and equipment selection
  • DNO applications and grid-connection coordination
  • Installation, commissioning and handover documentation
  • Monitoring, maintenance and performance review
  • Battery-storage modelling where it adds value

Grid connection is part of the design

Commercial projects often require a formal Distribution Network Operator assessment. Depending on system size, existing generation and export arrangements, Engineering Recommendations G98, G99 and G100 may be relevant. We consider connection requirements early so the proposed system is designed around the site’s real network constraints.

Commercial decisions need clear assumptions

We explain the assumptions behind the model: expected annual generation, on-site use, export, degradation, tariff inputs and the effect of operating hours. The result should be a decision-making tool rather than simply a headline payback number.

Standards & approvals

Designed and installed within the UK technical framework.

Requirements vary by project, but commercial PV commonly brings together electrical, grid-connection, construction and product standards.

BS 7671

Electrical installation

PV electrical work is designed and installed to the current requirements of BS 7671, including the provisions for solar PV power-supply systems.

MCS / MIS 3002

Certified installations where applicable

For projects within MCS scope, work can be delivered in accordance with the current MCS solar PV installer standard and the IET Code of Practice for Grid Connected Solar Photovoltaic Systems.

ENA G98 / G99 / G100

Grid connection

The connection route is determined by the generating equipment, aggregate output and export arrangements. Non-domestic projects are coordinated with the relevant DNO.

CDM 2015 / EAWR 1989

Safe design and delivery

Commercial projects are planned around relevant construction duties and the Electricity at Work Regulations, including safe design, installation, operation and maintenance.

Standards and regulations are applied according to the specific project, system size, location and building. MCS and NICEIC accreditations used for PB Energy installation work are held by P Bradshaw.

Project pathway

From feasibility to a working energy asset.

1. Assess

Site, electrical infrastructure, roof/land and energy data.

2. Model

Generation, self-consumption, export and commercial scenarios.

3. Approve

Detailed design, DNO process and project planning.

4. Deliver

Installation, testing, commissioning and handover.

5. Monitor

Performance visibility, maintenance and future optimisation.

Ready to make energy work harder?

Start with a practical conversation.

Tell us about your site, energy use or compliance challenge and we’ll help identify the next sensible step.

Contact PB Energy →